Kandy Greater Water Scheme • Completed 2022
Electromechanical turnkey package for a 40,000 m³/day municipal water intake, filtration, and high-lift pumping scheme providing clean drinking water to over 250,000 residents.
Water hammer shocks on sudden power failure risked catastrophic pipeline rupture, requiring synchronized electrical valve deceleration and automated soft-stop pump sequences.
Implemented multi-motor 450kW Variable Frequency Drive (VFD) panels with built-in surge vessel monitoring and automatic ramp-down algorithms, backed by dual utility power feeders and instant diesel generator changeover.