Engineering Overview

Turnkey design and installation of the complete power distribution network for a 250,000 sq. ft. continuous manufacturing facility. The installation included dual 2.5 MVA dry-type transformers, 5000A Form 4b MDBs, and heavy-duty overhead busbar trunking.

The Challenge

The client required a resilient power system capable of handling extreme non-linear harmonic loads generated by multiple high-tonnage electric arc furnaces and variable speed drive motors without causing equipment overheating.

The Engineering Solution

WIN-TEC engineered custom harmonic-mitigated capacitor banks with 7% detuned reactors, K-factor rated dry transformers, and an intelligent automated power-monitoring SCADA that dynamically tracks THD levels across all sub-circuits.

Automated Heavy Manufacturing Power Distribution installation

Key Scope & Technical Deliverables

  • 2 x 2500kVA cast resin dry-type transformers and enclosures
  • 5000A Form 4b fully segregated Main Distribution Board (MDB)
  • Overhead compact sandwich copper busbar trunking (3200A & 1600A)
  • Motor Control Centers (MCC) for 45 heavy induction motors
  • Emergency automatic synchronizing system for dual 1500kVA diesel generators

Project Results & Impact

Power Factor Consistently maintained at > 0.98, eliminating utility penalties
Uptime Record 99.99% electrical reliability across continuous operations
Energy Savings Annual energy savings exceeding LKR 18 Million
Project Quick Facts
  • Client Lanka Heavy Industries PLC
  • Location Biyagama Export Processing Zone
  • Category industrial
  • Completion Year 2023
  • Contract Duration 9 Months